Sykje yn Support

Mij stipescams. Wy sille jo nea freegje in telefoannûmer te beljen, der in sms nei ta te stjoeren of persoanlike gegevens te dielen. Meld fertochte aktiviteit mei de opsje ‘Misbrûk melde’.

Mear ynfo

Issue Importing .ics Files into Google Calendar via Thunderbird

  • Gjin antwurden
  • 0 hawwe dit probleem
more options

I am experiencing an issue when importing `.ics` files into a Google Calendar integrated with Thunderbird. Specifically, when I attempt to import an `.ics` file containing multiple events into my Google Calendar through Thunderbird, only the first event is imported; the subsequent events are not added. However, when I import the same `.ics` file into a local calendar within Thunderbird, all events are imported correctly.

Steps to Reproduce: 1. Open Thunderbird and navigate to the Calendar section. 2. Ensure that a Google Calendar is integrated and active. 3. Attempt to import an `.ics` file containing multiple events into the Google Calendar. 4. Observe that only the first event is imported, while the others are omitted.

Additional Information: - Thunderbird Version: 128.4.3esr (64 bit) - Operating System: windows 11 64bit - The `.ics` file in question has been validated and functions correctly when imported into other calendar applications and local calendars within Thunderbird.

I have researched this issue and found that other users have encountered similar problems when importing `.ics` files into network calendars, such as Google Calendar, via Thunderbird.

Request for Assistance: Could you please provide guidance on how to resolve this issue? Is there a known workaround or a planned update to address this problem? Any assistance or recommendations would be greatly appreciated.

Here, as a sample, the ics structure that I've tried to import: BEGIN:VCALENDAR VERSION:2.0 PRODID:-//Your Company//NONSGML v1.0//EN BEGIN:VEVENT UID:event-2@_EXPORT_ICS.xlsm SUMMARY:prova 1

DTSTART:20241118T100000Z DTEND:20241118T120000Z DESCRIPTION:prova 1

LOCATION: END:VEVENT BEGIN:VEVENT UID:event-3@_EXPORT_ICS.xlsm SUMMARY:prova 2

DTSTART:20241120T140000Z DTEND:20241120T160000Z DESCRIPTION:prova 2

LOCATION: END:VEVENT BEGIN:VEVENT UID:event-4@_EXPORT_ICS.xlsm SUMMARY:prova 3

DTSTART:20241122T100000Z DTEND:20241122T120000Z DESCRIPTION:prova 3

LOCATION: END:VEVENT END:VCALENDAR


Thank you for your support.

I am experiencing an issue when importing `.ics` files into a Google Calendar integrated with Thunderbird. Specifically, when I attempt to import an `.ics` file containing multiple events into my Google Calendar through Thunderbird, only the first event is imported; the subsequent events are not added. However, when I import the same `.ics` file into a local calendar within Thunderbird, all events are imported correctly. Steps to Reproduce: 1. Open Thunderbird and navigate to the Calendar section. 2. Ensure that a Google Calendar is integrated and active. 3. Attempt to import an `.ics` file containing multiple events into the Google Calendar. 4. Observe that only the first event is imported, while the others are omitted. Additional Information: - Thunderbird Version: 128.4.3esr (64 bit) - Operating System: windows 11 64bit - The `.ics` file in question has been validated and functions correctly when imported into other calendar applications and local calendars within Thunderbird. I have researched this issue and found that other users have encountered similar problems when importing `.ics` files into network calendars, such as Google Calendar, via Thunderbird. Request for Assistance: Could you please provide guidance on how to resolve this issue? Is there a known workaround or a planned update to address this problem? Any assistance or recommendations would be greatly appreciated. Here, as a sample, the ics structure that I've tried to import: BEGIN:VCALENDAR VERSION:2.0 PRODID:-//Your Company//NONSGML v1.0//EN BEGIN:VEVENT UID:event-2@_EXPORT_ICS.xlsm SUMMARY:prova 1 DTSTART:20241118T100000Z DTEND:20241118T120000Z DESCRIPTION:prova 1 LOCATION: END:VEVENT BEGIN:VEVENT UID:event-3@_EXPORT_ICS.xlsm SUMMARY:prova 2 DTSTART:20241120T140000Z DTEND:20241120T160000Z DESCRIPTION:prova 2 LOCATION: END:VEVENT BEGIN:VEVENT UID:event-4@_EXPORT_ICS.xlsm SUMMARY:prova 3 DTSTART:20241122T100000Z DTEND:20241122T120000Z DESCRIPTION:prova 3 LOCATION: END:VEVENT END:VCALENDAR Thank you for your support.

Jo moatte jo oanmelde by jo account om op berjochten te antwurdzjen. Stel in nije fraach as jo noch gjin account hawwe.